×

rejected part meaning in English

不合格部件或零件
不合格部年或零件
拒收部件或零件

Examples

  1. The quality control of the development control is a kind of original control and system control , and need carry out the idea of " prevention first , success one time " , and devide the development period reasonablly , the basic requirement of the quality control during the development period . the quality control during the manufacturing period must strengthen the control for purchased parts , working procedure , batch , key parts and important parts , quality check , reject parts , technical status , treating of with quality issues , etc . we must adopt check method in effect to assure that the reject products can not be taken out of the factory . we must collect and treat the quality information for the employment period , and serve the users in a good way
    研制过程的质量管理是源头的管理、系统的管理,必须贯彻预防为主、一次成功的思想,合理地划分研制阶段,遵循研制阶段质量管理的基本要求;生产过程质量管理要从外购器材的管理、工序的管理、批次的管理、关键件和重要件的管理、质量检验的管理、不合格品的管理、技术状态的管理、质量问题的处理等方面加强控制;采取有效的验收方法保证不合格的产品不出厂;及时收集处理使用过程的质量信息,做好为用户服务。

Related Words

  1. reject region
  2. reject box
  3. call rejected
  4. lapping rejects
  5. reject chimarking
  6. rejecting confession
  7. rejected ore
  8. reject component
  9. reject pocket
  10. modify reject
  11. rejected negative
  12. rejected ore
  13. rejected product
  14. rejected recharge
PC Version

Copyright © 2018 WordTech Co.